[Moon-net] 8877 Progress
Edward Cole
kl7uw at acsalaska.net
Thu Dec 27 02:16:49 CST 2007
The 8877 Control Panel is constructed ready to be wired and panel
painted/labeled.
After the panel is wired, meters calibrated and bias ckts adjusted, HV tested.
Then the RF assembly will be finished.
Photos: http://www.kl7uw.com/2m-8877.htm
73,
Ed - KL7UW
======================================
BP40IQ 50-MHz - 10-GHz www.kl7uw.com
144-EME: FT-847, mgf-1801, 4x-xpol-20, 185w
DUBUS Magazine USA Rep dubususa at hotmail.com
======================================
More information about the Moon-net
mailing list